Find Us On Facebook

Shire Waterbed Service

4-Drawer Mattress Base

Department Cuts Fabric Into Pattern.
cutting fabric to pattern
Bed Head Frames
Notice the solid framework & note the board width and spacing
bed head frames
Top Of Drawer Unit Is Made Wide Board Width and Narrow Spacing
top of drawer unit
Bottom Of Drawer Unit Is Added
bottom of drawer unit
Truck Loaded at Carpenter Shop & Transferred to the Upholsterer Building.
truck loaded
Sorted By Order Ready To Be Upholstered
sorted ready to be upholstered
Frame Work Readied To Be Upholstered
framework ready
Beginning To Be Upholstered
beginning the upholstery
Legs or Castor Wheels Mounted
legs / castors mounted on bases
Packaging Crew Two Person All Day
packing crew in action
Packaged ready to ship.
bases ready to ship

Contact Us

Shire Waterbed Service
Phone: (02) 9531 1311
Mobile: 0408 674 280
Email: Please use our contact page